Stop Moved
Route 6 Detour - Wednesday, July 8, 2026 - Construction between Health and Human Services and Community Mental Health
Beginning at the start of service on Wednesday, July 8, 2026, Route 6 will be on detour due to a construction project on the access drive between the Health and Human Services Complex and Community Mental Health (CMH).
Stops Impacted:
• 160 – Community Mental Health
For the duration of the project, Route 6 will travel as follows:
• Regular route to first perimeter exit drive onto Jolly Road
• Right (east) on Jolly to Community Mental Health’s Driveway
• Right (south) on CMH’s Driveway, continuing south/west/north through the CMH Parking Lot back to the main east/west access driveway in front of the CMH Complex
• Right (east) on the main access driveway in front of CMH to the north/south entry/exit driveway
• Left (north) on the entry/exit driveway to Jolly Road – Resuming regular routing thereafter
o A temporary bus stop will be located on the east side of the CMH north/south entry/exit driveway
At this time, the duration of the construction project is unknown.
